Tuesday, December 26, 2023

Three Decades of Software Vendor Selection

Traffic sign: Fork in the road
This post continues my series on lessons learned in my career. Chronologically, we left off with my work on a major system development project at Smith Tool. By the time I finished, I had been an independent consultant for about six years. But during that time, I also began to branch out to other clients. These included travelling around the US and beyond, doing mainframe conversion training, 4GL software development, and other consulting engagements.

All these clients had one thing in common. They all came directly or indirectly by referrals from former coworkers at Smith. As it turns out, I was lucky. When a sole proprietor, like me at this time, is busy with project work, it is difficult to develop new opportunities. And when a project ends, it is not easy to develop a new opportunity on short notice. Those independent consultants I know who have been successful over many years generally have reputations as experts. They also tend to have multiple revenue streams in addition to their consulting work, such as paid speaking engagements, books, or paid media contributions. Balancing project work with business development is easier for a consulting firm with some scale, something I would learn later in my career.

But in 1989, there was still one more referral for me. A former coworker from Smith Tool, Rick McGough, had just been hired as the top IT executive for Toshiba America Medical Systems (TAMS) [1]. TAMS was the U.S. distribution and field services unit for Toshiba’s medical diagnostic imaging device business [2]. Rick was looking to replace a homegrown business management system with a commercial ERP system. TAMS already had two Deloitte consultants on the project [3], but Rick wanted “his own guy” on the project team as well. So, he brought me in. This would my first real exposure to a full-blown ERP selection project, and this was the basis for my continuing this type of work over the following three decades, evaluating and selecting all manner of software, including ERP, but CRM, HCM, supply chain, and other categories of enterprise systems.

Lesson #1: Focus on Differentiators

The Deloitte consultants had recycled a requirements document of several hundred pages from a previous client and attempted to modify it for use at Toshiba. This turned out not to be a great approach, as the document included a number of requirements that didn’t apply to TAMS, and it missed several important requirements.

One key requirement was serial number tracking, which is an FDA regulatory mandate. Each unit of equipment and even critical components within a finished assembly need to be tracked with a unique identifier. So, if Toshiba receives 10 X-ray tubes from Japan, it’s not enough just to record a receipt of 10 units. It must record the serial numbers of those 10 units and track them in inventory and through distribution to the installed customer base. But guess what. The system that the team ultimately chose (BPCS from System Software Associates, or SSA) did not have serial number tracking. It did have lot number tracking, and the reseller’s proposed solution was to use the lot number as the serial number and modify the source code to force a lot quantity of one. They also had to do a modification to the inventory receipt program to allow the data entry user to enter the individual serial numbers at time of receipt. As you can imagine, there were other modifications needed for inventory management, sales, and distribution to accommodate the “lot number as serial number modification.”

To make a long story short, this was an example of a requirement that was so important that it normally should have disqualified that vendor from consideration [4]. I now call these types of requirements “differentiators.” They are more than priority A. They are show-stoppers. As a result, BPCS did not last long at Toshiba. It was replaced a few years later by Oracle Applications (today, E-Business Suite), which could satisfy the serial number tracking requirement as well as other differentiators.

Based on this lesson learned, I made a practice of identifying five to 10 differentiators for the client. I would use that to qualify vendors for the initial short list. In developing a short list, you really don’t need an RFP with hundreds or thousands of requirements. But you do need to know these key criteria. You can specify additional requirements (though I recommend avoiding hundreds) later in the selection process. Over the years, I had other experiences where the client made a vendor selection decision without following this best practice [5].

Lesson #2: If You Must Modify, Do It with Bolt-on Modifications

Another concept I developed during this project was the difference between good modifications and bad modifications. I recall standing at a whiteboard, discussing this with the Deloitte consultants. I told them we should avoid customizing vendor source code. The reason is that it may disrupt the logical integrity of the system—it may break the system in unanticipated ways. Second, it makes it difficult to upgrade to new releases of the software, because all those customizations will need to be carried forward to the new version.

Instead of customizing the vendor’s source code, I said that we should develop what I called “bolt-on modifications.” I drew a diagram on the white board, showing the modifications as a separate program or subsystem external to the vendor’s code, and calling it by means of an API. This approach is common today in what is known as a service-oriented, modular, or composable architecture [6].

Sadly, the modification to the lot number logic I mentioned in the previous lesson could not be accomplished with a bolt-on modification. It required modification of the core source code. As a result, it took the project team six months shortly after the initial implementation to do an upgrade to the next version.

Lesson #3: ERP Can Be Hard to Justify with Tangible Benefits

An ERP implementation is a major expenditure, and as such it would need management approval in the form of a capital expenditure request, which would need to budget both the costs and the anticipated benefits. The cost side of the equation is usually easy—hardware, software, and implementation costs could all be estimated based on vendor proposals.

The benefits side, however, is more difficult, especially if you want to identify tangible benefits. The project team for improvements in inventory accuracy, order fill rates, customer service improvements, and other areas. Time and again, we would identify a possible improvement but would conclude, “it doesn’t move the needle” [7]. Later in my career, our research at Computer Economics confirmed this finding [8].

When there are tangible benefits, they are mostly in two areas:
  • Productivity savings. If the organization required 15 accounts payable personnel and the new system could cut that number to 10, that would be a productivity improvement. But few organizations really want to bank on that—they hate to lay off people. They would rather redeploy them into other roles. Or, they would rather say that the new system could allow future growth without adding to administrative headcount.
  • Discontinuation of legacy systems. If the new system is replacing an old system—and preferably several old systems, there will be savings in the hardware, software, and personnel that supported the old system. If the system was highly modified, the new system might require fewer personnel, although this is often not the case, especially in the early years.
Therefore, in selection projects over the years, I’ve concluded that ERP benefits are mostly intangible—difficult to put a dollar value on. If done right, they give management better data to support decision-making, and they provide a single source of truth. Most importantly, they provide a better platform for future systems that rely on ERP data, such as business intelligence. There are also other more strategic drivers: the old system might no longer be supported by the vendor, or it might be on a legacy hardware platform. I’ve seen more situations where this was the driving force for a system replacement than I have with a business case based on tangible benefits [9].

Lesson #4: Software Selection Is More Than Selecting Software

But the greatest lesson learned from this first selection project and over the following three decades is that software selection projects are really mis-named. They are not just about selecting software—they are about business transformation. As such, there are some key success factors:
  • Business sponsorship. Just because computers are involved does not make these projects computer projects. They should be driven by the business, with the IT organization as part of the project team. Top management should actively sponsor the project and not delegate it to middle management.
  • Strategic alignment. Many ERP selections arise from organizations changing their business model, acquiring new lines of business, or expanding into new markets. To provide context, ERP selection should start with a review of the current and future business strategy and how IT is aligned to support it.
  • Application portfolio rationalization. Many clients have dozens of enterprise systems, and many of them are inter-connected. When replacing a major system, should those other systems stay or go? Most organizations would do well to first address the entire portfolio of applications and lay out a strategic road map to understand which should be replaced or consolidated.
  • IT organizational impact. Does the current IT organization have the needed skills to support the future applications road map, including the new system? If not, what new skills are needed and how should the IT staff be organized?
  • System integrator selection. Selecting the new software is not the only decision. Most organizations will need to select an ERP implementation partner. Having the right ERP system but the wrong implementation partner often leads to failure. In fact, some of my projects over the next 30+ years involved finding a new implementation partner to replace the one that failed.
  • Client-side planning. Generally, the system integrator will have a good handle on what it needs to do. But the client’s project team must also plan for the activities required on the client side, such as training, data conversion, procedure writing, and acceptance testing. The system integrator will generally expect the client to be responsible for these activities.
  • Business process improvement. New systems can involve major changes in business processes--hopefully for the better. The selection team should also anticipate what business process improvement will be needed as part of the new system and include those in the project plan.
  • Change management. Enterprise software implementations rarely fail because of technology problems (though, it does happen). They often fail because of organizational resistance to change. Engaging the organization during new system selection is how you gain buy in for the decision, setting the stage for cooperation during the implementation.

Further Industry Specialization

I look back at my experience with Toshiba as a major steppingstone in my career. As was my habit, once again, I immersed myself in the business—in this case medical devices. I interviewed business leaders and studied the various imaging system modalities, such as X-ray, MRI, CT, and ultrasound. Short term, this enabled me to continue consulting for Toshiba on the business side after the implementation was finished. I moved into the customer service group, defining requirements for future field service systems. Longer term, my experience at Toshiba became a foundation for my later industry focus on medical devices and life sciences in general, including FDA regulatory compliance.

Photo credit: Frank Scavo.   

End Notes

[1] Rick had had been hired at Smith Tool as a programmer analyst in 1978, about the same time I was. But whereas I took a career path to get deeper into the business, eventually leaving the IT department, Rick chose an IT management path. He rose through the ranks eventually becoming the IT director. As noted in an earlier post, the 1980s were a tumultuous time for Smith, and in 1989 Rick left to take the top IT job at Toshiba. He is now retired after holding several senior IT positions at other firms.

[2] Toshiba Medical was acquired by Canon in 2016 and is now Canon Medical Systems Corp. The US headquarters is still located just a few miles from where we lived at the time.

[3] One of those two Deloitte consultants was John Olszewski. John became a good friend, and we worked together on and off for something like six to eight years for other clients. He continued with Toshiba long after my work there was completed. He eventually played a leading role in replacing BPCS with Oracle Applications. With that experience, he then went to work for Oracle, where he is now Senior Director E-Business Suite Service Product Management.

[4] There was one key requirement that tipped the scales in favor of BPCS and that was its ability to specify sales features and options in a multi-level planning bill of material. None of the other systems on our short list, which Toshiba had restricted to IBM midrange systems, could satisfy that requirement.

[5] Several years later, I had another client where the chosen vendor did not satisfy a show-stopper. Coincidentally, John Olszewski and I worked together on this project. We came in after the vendor selection to help with the implementation. Here the client was a well-known multi-level marketing (MLM) company. In this industry, customers (i.e., independent distributors) would deposit cash into their accounts against which they would place orders for their customers. The MLM company would then fulfill those orders. In other words, the independent distributors had to pay in advance. But the chosen system was a typical B2B system. It assumed the independent distributor would place an order, and then the MLM company would fulfill it, invoice the distributor, collect the payment, and apply it to the invoice. As a result, we had to modify the system to accommodate this fundamental process misalignment. In retrospect, this system should have been dropped from consideration just based on this one showstopper.

[6] The term “bolt-on modification” is in common use today, but I am convinced that I invented the term. I have searched and have not been able to find a reference to the use of this metaphor prior to 1989. Yes, it was used in the automotive industry, but I can’t find anyone using it relative to software engineering. If anyone can find it, I will be happy to give up my claim. But until then, I am claiming authorship.

[7] As in the previous note, I’m convinced that I coined the phrase, “it doesn’t move the needle.” In trying to come up with the business case, I used it as shorthand for, “Yes, that may be a benefit, but it is too small to really make a difference.” I had in mind an automobile fuel gage where adding a small amount of fuel would not be enough to make the needle move. Again, I have not been able to find use of this term as a metaphor prior to 1989. But I’m willing to see evidence otherwise.

[8] Our research at Computer Economics (now part of Avasant) over the years compared the ROI and TCO experience of a number of IT investments. We found consistently that ERP ranked dead last in economic success. We argue that this does not mean organizations should not invest in ERP, but rather that the benefits on the one hand can be difficult to quantify and that the costs need to be carefully controlled to stay within budget.

[9] What about growth in revenue? In my experience, it is difficult to claim top line benefits from ERP systems, which are mainly focused on back office processes. If a new ERP system is needed to support a new line of business, there would be top line benefits, of course, but the contribution of ERP is indirectly tied to that outcome. CRM systems on the other hand might be justified in terms of improved customer service, improved upsell/cross-sell performance and other measures that increase revenue. 

Monday, November 16, 2015

Which Comes First, New Systems or New Processes?

Everyone agrees that business process improvement is a key success factor in enterprise system implementation. But, which comes first? Should organizations redesign their business processes before selecting and implementing new systems? Or should they first select a new software vendor and then redesign their processes to match how the new system does things?

This question comes up repeatedly in our vendor evaluation and software selection consulting services. Clients read about failed ERP or CRM projects, for example. They hear the warnings of executives from such companies, telling them to spend more time up front understanding their business processes. They hear about companies that go live but don’t achieve the desired benefits. They vow to do better. They don’t just want to implement a new system. They want to implement best business practices.

These are good reactions. When it comes to enterprise systems, anything that heightens the fear of failure is a good thing. The more business leaders are focused on business processes, the better.

But, how should business leaders deal with their business processes when implementing a new system?
  • Should they improve their processes before implementing the new system, so that the new system is not automating broken processes?
  • Or, should they choose the new system first, so that they can redesign their business processes using the best business practices that are embodied in the new system?

The answer is a little bit of both: the two should be done in parallel. In fact, doing all of one before the other—whether process first, or system first—will result in failure.

Read the full post on the Strativa website:
Which Comes First, New Business Processes and New Systems?

Sunday, February 22, 2015

ERP Selection Is Not Just About Vendor Selection


When an organization decides to look for a new ERP system, consultants and vendors often refer to that effort as an "ERP selection project." Sometimes they will refer to it as ERP vendor selection, or an ERP vendor evaluation, but the idea is the same.

I've been advising companies on ERP selection since 1989, and my consulting firm Strativa has been doing ERP selection consulting since 2000. After many such projects, I've come to the conclusion that the whole process is misnamed. Why? Because referring to the effort as an ERP vendor selection project makes the choosing the right system the primary objective. 

Does this mean that it's not important for an organization to select the right system or the right vendor?  Of course not. But picking the right vendor is only a small part of what organizations need in these projects.

What Organizations Need in ERP Selection Projects

So what should ERP selection projects include, in addition to ERP vendor selection? Here are a few critical needs: 
  • Forming a team. I'm always concerned when the ERP selection decision is driven primarily by the IT organization. Part of the ERP selection effort has to be to to draft key leaders from the business side of the organization.  
  • Gaining executive sponsorship. ERP selection is a major business change initiative. Without executive sponsorship, the project will go nowhere. An early activity, therefore, is to ensure that top management is behind the effort. 
  • Business and IT strategy. Many ERP selections arise from organizations changing their business model, acquiring new lines of business, or expanding into new markets. To provide context, ERP selection should start with a review of the current and future business strategy and how IT is aligned to support it. 
  • Applications systems road map. Many of our clients have dozens of systems in addition to ERP, and many of them are connected to the ERP system. Should those systems stay or go? Most organizations would do well to first address the entire portfolio of applications and lay out a strategic road map to understand the impact of a new ERP system.
  • Application platform decision. Will the new ERP system be deployed on-premises, be hosted by a service provider, or will it be a true cloud system? The choice here will also have implications for the applications road map.
  • IT organizational impact. Does the current IT organization have the needed skills to support the future applications road map, including the new ERP system? If not, what new skill are needed and how should the IT staff be organized? Many of our ERP selection projects include side projects for skills acquisition.  
  • Defining key requirements.  It goes without saying, if you don't know what makes your business different from others, or what makes software vendors different from one another, it's difficult to pick the right system. Defining key issues should precede creation of the vendor short list. 
  • Unbiased evaluation of current ERP system. Sometimes insiders, being so familiar with the shortcomings of the organization's existing ERP system, assume that a new system is the only solution. In our ERP vendor selection consulting, however, we find a small percentage of projects where the current system is the best choice, perhaps with a version upgrade. A truly independent ERP selection consultant will include the current system for consideration. 
  • Choosing an implementation partner. ERP vendor selection is not the only decision: most organizations will need to select an ERP implementation partner. Having the right ERP system but the wrong ERP implementation consultant rarely leads to success.
  • Negotiating contracts. ERP selection does not end with picking the right system. There are ERP software license agreement, implementation consulting agreements, and in many cases these days there are contracts and service level agreements for hosting partners or cloud services providers. Your legal counsel can address legal terms and conditions, but most lawyers do not have a clue about broader issues of technical agreements. Contract review and negotiation is another key activity in ERP selection projects. 
  • ERP implementation planning. Generally, the ERP implementation partner has a good handle on the activities it must perform, but the ERP selection team must also plan for the activities required on the client side, such as training, data conversion, procedure writing, and acceptance testing. Planning for client-side staffing is also a key need.
  • Business case approval. You can pick the right vendor and negotiate fair agreements, but if your own organization does not see the business value, the project will not be approved. ERP selection projects often need to include business case preparation, in business terms.
  • Business process improvement. ERP systems can involve major changes in business processes--hopefully for the better. The ERP selection team should also anticipate the business process improvement needed as part of the new system.
  • Change management. ERP implementations rarely fail because of technology problems (though, it does happen). ERP implementation projects often fail because of organizational resistance to change. How you engage the organization during ERP selection is how you gain buy in for the decision, setting the stage for cooperation during the implementation. 
As shown by this long list of activities, very little of what we call ERP selection is the process of coming up with a short list and picking a winning vendor. Most of the process should be oriented around the activities to make a major business change initiative successful. 

Free ERP Selection Is Not Free

The fact that organizations need much more than picking the right vendor hasn't stopped some service providers and consultants from focusing on it, however. Since the 1990s, consultants have been advising buyers on how to create a short list and pick the right system. 

The free vendor evaluation websites are the worst offenders. I won't name them, but you can find them in any Google search for "ERP selection." Most have just one service: creating a short list of ERP vendors for you to consider. What they don't tell you is that their service is free because these sites make money is by selling your contact information to the very same vendors that they are short listing for you. They are not advisory services for buyers, they are lead generation services for vendors.

Some companies come to us for ERP selection consulting after they've used these free vendor selection websites. Invariably, we find the prospect has already been flooded with phone calls and emails from vendors that were referred to them by the vendor evaluation websites.  It only makes our job that much harder while we are trying to focus on the other 90% of what it takes to make an ERP selection project successful.

Buyers Are Getting Smarter

Ironically, while clients come to us for help in ERP selection, I'm finding that the area where they need the least help is in identifying vendors for their short list. By the time clients reach out to us they've already done quite a bit of homework online and networking with associates to find out who the popular vendors are. In some recent deals, I've had new prospects rattle off a list of other companies in their industry and what ERP systems they are running.

Invariably, however, we usually know of a few vendors that should be short-listed that the client hasn't heard of. In addition, the client may have misconceptions about what certain vendors are good at, or not good at. Nevertheless, I'm finding buyers today are much more knowledgeable than ever about the ERP vendor landscape. 

At the same time, clients are realizing their needs beyond selection. They have all heard the stories of multi-million dollar ERP failures, and they realize that not all the blame can be placed on the ERP vendors or the ERP implementation consulting firms. They are much more aware of their needs and making ERP selection much more than vendor evaluation.

Even if they still refer to their efforts as ERP selection projects. 